During the design of a public transportation terminal, the project team specifies the structural load requirements (functional) and ambient noise thresholds (nonfunctional) for the main concourse. Which of the following actions best ensures that both sets of requirements are coordinated and met at the system level?
Nội dung câu hỏi
During the design of a public transportation terminal, the project team specifies the structural load requirements (functional) and ambient noise thresholds (nonfunctional) for the main concourse. Which of the following actions best ensures that both sets of requirements are coordinated and met at the system level?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Include load specifications in the material procurement checklist.
- B. Conduct an early-stage design review that integrates both structural engineering and acoustical analysis. — đáp án hiện tại
- C. Assign separate quality engineers to independently validate structural and acoustic performance.
- D. Request that the contractor provide warranties for both structural integrity and soundproofing materials.