Câu 196: CMQ-OE: Certified Manager of Quality/ Organizational Excellence
A U.S. manufacturer has an offshore, single-source supplier for a critical part. Many of the parts are rejected by receiving inspection because they are out of tolerance, but the material review board subsequently accepts those rejects. If a process improvement team has been asked to focus on this problem, which of th…
Nội dung câu hỏi
A U.S. manufacturer has an offshore, single-source supplier for a critical part. Many of the parts are rejected by receiving inspection because they are out of tolerance, but the material review board subsequently accepts those rejects. If a process improvement team has been asked to focus on this problem, which of the following steps should the team take first?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Review the specification limits with engineering
- B. Perform 100% inspection on incoming parts from this supplier
- C. Require the supplier to provide a certificate of conformance for each lot — đáp án hiện tại
- D. Reject all lots until the supplier corrects the problem