CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 11: 78201X: Avaya IP Office Platform Support Certified

There is a recommended order to powering up the Avaya IP Office™ 500V2. Why is the first step to power up the expansion modules before powering up the control unit?

Nội dung câu hỏi

There is a recommended order to powering up the Avaya IP Office™ 500V2. Why is the first step to power up the expansion modules before powering up the control unit?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. It is easier to start with the expansion unit at the top and then work your way down.
  2. B. All expansion units need to be powered for the control unit to discover them. — đáp án hiện tại
  3. C. The configuration files from the expansion units SD cards need to be loaded before the control unit is started.
  4. D. The expansion units take longer to power up.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề