A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?
Nội dung câu hỏi
A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Clearances will still be adequate with the added equipment. — đáp án hiện tại
- B. That all of the poles on the path are at least Class 3.
- C. Sufficient space exists to install additional guying if required.
- D. Utility coordination with public utilities verifies minimum inductive interference.