A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?

Nội dung câu hỏi

A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY consideration?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Clearances will still be adequate with the added equipment. — đáp án hiện tại
  2. B. That all of the poles on the path are at least Class 3.
  3. C. Sufficient space exists to install additional guying if required.
  4. D. Utility coordination with public utilities verifies minimum inductive interference.