Câu 43: AD01: Blue Prism Developer
Consider the following process flow: What is the problem with this flow?
Nội dung câu hỏi
Consider the following process flow: What is the problem with this flow?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. There is nothing wrong with this flow.
- B. The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly — đáp án hiện tại
- C. The Attach Block should be enlarged to also include the "˜Waited Long Enough?' decision stage.
- D. The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session.
- E. The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.