CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 3: APD01: Blue Prism Professional Developer

A Process is fed cases to work from a spreadsheet held in a shared drive. The location of the shared drive is different between Development and Production environments. How should this be managed?

Nội dung câu hỏi

A Process is fed cases to work from a spreadsheet held in a shared drive. The location of the shared drive is different between Development and Production environments. How should this be managed?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. During the build and test phase, hold the "˜Development' path to the spreadsheet in a data item within a Process. When the Process is imported into Production it will be opened and the data item will be amended to hold the "˜Production' path.
  2. B. During the build and test phase, hold the "˜Development' path to the spreadsheet in a data item within a Process. Expose this data item as a Session Variable. When the Process is run in Production, this Session Variable value can be set in Control Room — đáp án hiện tại
  3. C. Hold the Path to the spreadsheet as an Environment Variable
  4. D. Pass the Path as a Startup Parameter when the process starts

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề