Câu 47: 300-165: Implementing Cisco Data Center Infrastructure

Instructions -* This task does not require device configuration.* Click Cisco Nexus 5548 to gain console access. No console or enable passwords are required.* To access the multiple-choice questions, click the numbered boxes on the left of the top panel.* There are four multiple-choice questions with this task. Scenar…

Nội dung câu hỏi

Instructions -* This task does not require device configuration.* Click Cisco Nexus 5548 to gain console access. No console or enable passwords are required.* To access the multiple-choice questions, click the numbered boxes on the left of the top panel.* There are four multiple-choice questions with this task. Scenario -Customer is deploying Cisco Nexus 5548 switch with FCoE in their new data center, as shown in the topology diagram. Click Nexus5548 icon to run show commands and answer the questions. Ethernet interface 1/5 on Cisco Nexus 5548 is connected to Cisco UCS C220 rack server. What is the status of Ethernet 1/5 interface for FCoE functionality?

Minh họa câu hỏi Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Interface reset on Ethernet 1/5 is preventing the FCoE connection from coming up
  2. B. MTU size of 1500 on Ethernet interface 1/5 needs to be changed for FCoE to come UP
  3. C. Cisco Nexus 5548 needs a layer 3 daughter card for FCoE to come UP on the Ethernet interface 1/5
  4. D. Ethernet interface 1/5 is operational for FCoE and the status is UP — đáp án hiện tại

Cộng đồng