Which two tasks enable jumbo frames on a Cisco UCS system? (Choose two.)

Nội dung câu hỏi

Which two tasks enable jumbo frames on a Cisco UCS system? (Choose two.)

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. In the LAN cloud on Cisco UCS Manager, configure MTU 9000 in the uplink interfaces.
  2. B. In the LAN cloud on Cisco UCS Manager, enable jumbo frames in Fabric A and Fabric B.
  3. C. In the LAN cloud on Cisco UCS Manager, configure MTU 9000 in the VLAN.
  4. D. In the LAN cloud on Cisco UCS Manager, define a QoS system class with MTU 9000. — đáp án hiện tại
  5. E. In the service profile, configure MTU 9000 in the vNIC. — đáp án hiện tại
  6. F. In the service profile, configure MTU 9000 in the virtual machine.
  7. G. In the service profile, configure MTU 9000 in the uplink interfaces.