Câu 49: 300-615: Troubleshooting Cisco Data Center Infrastructure (DCIT)
A Cisco UCS C-Series Server powers off due to a power outage. The server should turn on when the power is restored with a fixed delay of 3 minutes. However, it remained powered off for more than 3 minutes after the engineer powered it back online. Which two actions resolve the issue? (Choose two.)
Nội dung câu hỏi
A Cisco UCS C-Series Server powers off due to a power outage. The server should turn on when the power is restored with a fixed delay of 3 minutes. However, it remained powered off for more than 3 minutes after the engineer powered it back online. Which two actions resolve the issue? (Choose two.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Configure the power-restore-policy.
- B. Configure the power restore last-state policy. — đáp án hiện tại
- C. Configure power sync policy.
- D. Set the delay fixed value to 3.
- E. Set the delay value to 180. — đáp án hiện tại