Câu 89: 300-615: Troubleshooting Cisco Data Center Infrastructure (DCIT)

Refer to the exhibit. A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?

Nội dung câu hỏi

Refer to the exhibit. A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?

Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Replace the SFP port module in fc2/10.
  2. B. Configure the admin port type E on the upstream switch that connects the port.
  3. C. Enable NPIV on the upstream switch that connects the port. — đáp án hiện tại
  4. D. Configure the BB_credit buffers on the upstream switch that connects the port.