Câu 47: 300-615: Troubleshooting Cisco Data Center Infrastructure (DCIT)

Refer to the exhibit. A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the s…

Nội dung câu hỏi

Refer to the exhibit. A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)

Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Configure the “Do not pause on failure and do not wait on cluster health” Run Mode
  2. B. Choose the “Pause upon upgrade failure” Run Mode — đáp án hiện tại
  3. C. Select the “Graceful Maintenance” checkbox
  4. D. Place each leaf switch in a different upgrade group — đáp án hiện tại
  5. E. Check the “Ignore Compatibility” checkbox