Câu 98: 300-620: Implementing Cisco Application Centric Infrastructure (DCACI)

A recent set of changes by a Cisco ACI administrator corrupted the APIC cluster. The ACI engineer must restore the configuration of the previous day. The APIC nodes in the cluster can communicate but fail to connect with other networks. The administrator plans to overwrite the entire existing configuration with the ba…

Nội dung câu hỏi

A recent set of changes by a Cisco ACI administrator corrupted the APIC cluster. The ACI engineer must restore the configuration of the previous day. The APIC nodes in the cluster can communicate but fail to connect with other networks. The administrator plans to overwrite the entire existing configuration with the backup configuration. Which set of actions accomplishes this task?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Restore using the last configuration on the factory-reset APIC. Use an import policy set to Best-effort.
  2. B. Roll back the configuration using a local snapshot. Use an import policy set to Atomic Replace. — đáp án hiện tại
  3. C. Roll back the configuration using a local snapshot. Use an import policy set to Best-effort Merge.
  4. D. Restore the configuration imported from an FTP server. Use an import policy set to Atomic.