CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 36: 220-1202: CompTIA A+ Certification Exam: Core 2

A technician is preparing to replace the batteries in rack-mounted UPS system. After ensuring the power is turned off and the batteries are fully discharged, the technician needs to remove the battery modules from the bottom of the rack. Which of the following steps should the technician take?

Nội dung câu hỏi

A technician is preparing to replace the batteries in rack-mounted UPS system. After ensuring the power is turned off and the batteries are fully discharged, the technician needs to remove the battery modules from the bottom of the rack. Which of the following steps should the technician take?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Ensure the fire suppression system is ready to be activated.
  2. B. Use appropriate lifting techniques and guidelines. — đáp án hiện tại
  3. C. Place the removed batteries in an antistatic bag.
  4. D. Wear a face mask to filter out any harmful fumes.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề