Câu 88: FC0-U61: CompTIA IT Fundamentals
During a power outage, a server with redundant power supplies shuts down despite being connected to a UPS. The technician determines that the UPS has failed and replaces it. The technician then separates the power supplies to connect them to two separate UPSs. Which of the following troubleshooting steps did the techn…
Nội dung câu hỏi
During a power outage, a server with redundant power supplies shuts down despite being connected to a UPS. The technician determines that the UPS has failed and replaces it. The technician then separates the power supplies to connect them to two separate UPSs. Which of the following troubleshooting steps did the technician just accomplish?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Implement preventive measures. — đáp án hiện tại
- B. Establish a plan of action.
- C. Document findings/lessons learned.
- D. Test the theory to determine the cause.
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.