CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 10: N10-007: CompTIA Network+ 2018

To replace a defective UPS, the network administrator must take the switch offline. The administrator wants to be able to perform maintenance UPS in the future without affecting the availability of the attached switch. Which of the following would BEST allow this to happen?

Nội dung câu hỏi

To replace a defective UPS, the network administrator must take the switch offline. The administrator wants to be able to perform maintenance UPS in the future without affecting the availability of the attached switch. Which of the following would BEST allow this to happen?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Add a redundant power supply to the switch — đáp án hiện tại
  2. B. Implement stacking on the switches in the rack
  3. C. Add a second UPS into the rack
  4. D. Install a power converter for the switch

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề