Câu 75: N10-009: CompTIA Network+

After installing a series of Cat 8 keystones, a data center architect notices higher than normal interference during tests. Which of the following steps should the architect take to troubleshoot the issue?

Nội dung câu hỏi

After installing a series of Cat 8 keystones, a data center architect notices higher than normal interference during tests. Which of the following steps should the architect take to troubleshoot the issue?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Check to see if the end connections were wrapped in copper tape before terminating. — đáp án hiện tại
  2. B. Use passthrough modular crimping plugs instead of traditional crimping plugs.
  3. C. Connect the RX/TX wires to different pins.
  4. D. Run a speed test on a device that can only achieve 100Mbps speeds.