Câu 1: D-PDD-DY-01: Dell PowerProtect Data Domain Deploy v2
An implementation engineer is racking a Dell PowerProtect Data Domain appliance at a customer site. The controller and all expansion shelves are in the rack, and all the data cables are connected. What must they validate before connecting the power cables?
Nội dung câu hỏi
An implementation engineer is racking a Dell PowerProtect Data Domain appliance at a customer site. The controller and all expansion shelves are in the rack, and all the data cables are connected. What must they validate before connecting the power cables?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. The site supports three phase power to the rack
- B. The voltage aligns with the system requirements. — đáp án hiện tại
- C. There are dual power connections for the appliance
- D. There is a single power connection for the appliance
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.