Câu 12: D-PVM-DS-01: Dell PowerMax Design v2
Due to a technology refresh, the storage for a critical OLTP DB application on a PowerMax 8000 system will be migrated to a new PowerMax 8500 system. The application requires zero downtime, and the hosting team has minimal staff to support the extra work. What would be the best migration solution to meet the requireme…
Nội dung câu hỏi
Due to a technology refresh, the storage for a critical OLTP DB application on a PowerMax 8000 system will be migrated to a new PowerMax 8500 system. The application requires zero downtime, and the hosting team has minimal staff to support the extra work. What would be the best migration solution to meet the requirements?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. NDM with precopy. — đáp án hiện tại
- B. SRDF sync mode.
- C. Open Replicator with donor update.
- D. PowerPath migration enabler.