An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The MX700 has seven MX740c, one MX5016s, two Management Modules (MMs), an LED-Only control panel, two MX9116n in Fabric A, two MX5108n in Fabric B, and two MX5000s in Fabric C. What is a valid method to perform the initi…
Nội dung câu hỏi
An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The MX700 has seven MX740c, one MX5016s, two Management Modules (MMs), an LED-Only control panel, two MX9116n in Fabric A, two MX5108n in Fabric B, and two MX5000s in Fabric C. What is a valid method to perform the initial MX platform configuration?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Use a serial DB9 / DB cable
- B. Use KVM and racadm setniccfg command from MM configuration menu — đáp án hiện tại
- C. Use Ethernet front panel port default DHCP address
- D. Use QuickSync 2