Câu 46: E20-895: Backup Recovery - Avamar Expert for Implementation Engineers
An EMC customer is using the Avamar Exchange 2007 plug-in for message level backups on two Microsoft Windows Exchange 2007 environments in an ActiveDirectory Forest. They are deployed in a high availability configuration. The customer wants the ability to successfully backup after a cluster failover. What must be done…
Nội dung câu hỏi
An EMC customer is using the Avamar Exchange 2007 plug-in for message level backups on two Microsoft Windows Exchange 2007 environments in an ActiveDirectory Forest. They are deployed in a high availability configuration. The customer wants the ability to successfully backup after a cluster failover. What must be done to achieve a successful backup?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Avamar backup service must be configured and started on the active node in the cluster — đáp án hiện tại
- B. Avamar backup service must be configured and started on all nodes in the cluster
- C. Download the MAPI Client Libraries from the Avamar software library
- D. Configure the AvamarBackupUser account on each node in the cluster to backup both Exchange environments
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.