Management has requested for a 15 minutes battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:- Rated power: 30 kVA- Rectifier input voltage: 400 V/3 phase- Rectifier input power factor: 0.8- Battery rated voltage: 384 V- Number of cells: 192- End of discharg…

Nội dung câu hỏi

Management has requested for a 15 minutes battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:- Rated power: 30 kVA- Rectifier input voltage: 400 V/3 phase- Rectifier input power factor: 0.8- Battery rated voltage: 384 V- Number of cells: 192- End of discharge voltage: 308 V- Inverter output voltage: 400 V/3 phase- Inverter output power factor: 0.8What information is missing to perform the battery calculation?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. UPS efficiency — đáp án hiện tại
  2. B. Inverter efficiency
  3. C. Load imbalance on the phases
  4. D. Available battery charging current