A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not availa…

Nội dung câu hỏi

A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available. What type of generators should be installed?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Standby generators should be installed in at least an N+1 configuration
  2. B. Continuous generators should be installed, at least in an N+1 configuration
  3. C. A combination of standby-, prime- and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load — đáp án hiện tại
  4. D. Continuous generators should be installed: no N+1 configuration is needed as the generators will run all the time