In an SD-WAN TGW Connect topology, which three initial steps are mandatory when routing traffic from a spoke VPC to a security VPC through a Transit Gateway? (Choose three.)
Nội dung câu hỏi
In an SD-WAN TGW Connect topology, which three initial steps are mandatory when routing traffic from a spoke VPC to a security VPC through a Transit Gateway? (Choose three.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. From the security VPC TGW subnet routing table, point 0.0.0.0/0 traffic to the FortiGate internal port. — đáp án hiện tại
- B. From the security VPC FortiGate internal subnet routing table, point 0.0.0.0/0 traffic to the TGW. — đáp án hiện tại
- C. From the spoke VPC internal routing table, point 0.0.0.0/0 traffic to the TGW. — đáp án hiện tại
- D. From the security VPC TGW subnet routing table, point 0.0.0.0/0 traffic to the TGW.
- E. From both spoke VPCs, and the security VPC, point 0.0.0.0/0 traffic to the Internet Gateway.