Câu 19: CLSSBB: Certified Lean Six Sigma Black Belt

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Nội dung câu hỏi

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Review the Visual Factory to assure inventory in excess of desired visible — đáp án hiện tại
  2. B. Improve the lighting to assure adequate visibility
  3. C. Analyze data from supplier deliveries
  4. D. Reword the standardized work instructions to use active verbs and not passive phrases