Câu 20: HQT-4420: Hitachi Vantara Qualified Professional - Content Platform Installation
Your customer has tested a new HCP G10 with an S10 node and they now want to re-install the S10 node before turning it into production. What are three requirements? (Choose three.)
Nội dung câu hỏi
Your customer has tested a new HCP G10 with an S10 node and they now want to re-install the S10 node before turning it into production. What are three requirements? (Choose three.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. The S10 node must be retired in the HCP G10 System Management Console — đáp án hiện tại
- B. The S10 node must be disconnected from the HCP G10 cluster — đáp án hiện tại
- C. The S10 node must boot the installation package from the USB drive — đáp án hiện tại
- D. The Genesis build must be manually started on the S10 node
- E. The first-time setup wizard must be completed on the S10 node
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.