Câu 13: HPE0-S54: Designing HPE Server Solutions
Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40GbF8 modules. The customer wants to: ✑ add a second frame before they move into production ✑ have unified managementhave a separate logical enclosure for each frame Wha…
Nội dung câu hỏi
Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40GbF8 modules. The customer wants to: ✑ add a second frame before they move into production ✑ have unified managementhave a separate logical enclosure for each frame What are the basic steps to add the second frame? (Choose three.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Move the standby composer to the second frame. — đáp án hiện tại
- B. Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame. — đáp án hiện tại
- C. Install a satellite module in the first frame.
- D. Move the bottom VC module from the first frame to the second.
- E. Move one of the uplinks from the FLM in the first frame to a FLM in the second. — đáp án hiện tại
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.