Câu 13: HPE0-S58: Implementing HPE Composable Infrastructure Solutions
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPESynergy platform. Which steps must the integrator perform in the configuration to meet the customer's needs?
Nội dung câu hỏi
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPESynergy platform. Which steps must the integrator perform in the configuration to meet the customer's needs?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Connect Satellite modules using Ports L1 and L4 — đáp án hiện tại
- B. Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
- C. Install Redundant Frame Link Modules and a second management ring
- D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.