CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 12: HPE6-A45: Implementing Aruba Campus Switching solutions

Refer to the exhibits. Exhibit 1 - Exhibit 2 - Switch-1 has a power issue that causes it to fail. When Switch-1 comes back up, endpoints lose connectivity for a few minutes. The network administrator decides to enter this command on Switch-1:Switch-1 (config)# vlan 10 vrrp vrid 10 preempt-delay-time 120Exhibit 2 shows…

Nội dung câu hỏi

Refer to the exhibits. Exhibit 1 - Exhibit 2 - Switch-1 has a power issue that causes it to fail. When Switch-1 comes back up, endpoints lose connectivity for a few minutes. The network administrator decides to enter this command on Switch-1:Switch-1 (config)# vlan 10 vrrp vrid 10 preempt-delay-time 120Exhibit 2 shows the VRRP configuration just after the change. What is the effect of this change?

Minh họa câu hỏi Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Switch-1 and Switch-2 both become Master in their own VRRP virtual router due to the delay timer mismatch. The mismatch must be fixed.
  2. B. Switch-1 now waits to take over as Master if it fails and recovers. This should prevent the connectivity issue from occurring again.
  3. C. Switch-1 experiences an internal error in the VRRP process. This error causes Switch-2 to take over as Master for VLAN 2. — đáp án hiện tại
  4. D. Switch-1 continues to act as it did before the preempt delay time was set. Administrators must plan additional changes to fix the issue.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề