Câu 19: HPE6-A69: Aruba Certified Switching Expert

(Scenarios may contain multiple errors, which may or may not impact the solution.)Refer to the exhibit. An engineer has attempted to configure two pairs of switches in the referenced configuration. It is required to implement VSX keep-alive at the aggregation layer. The ports of the ArubaOS-CX 8325 switches used for A…

Nội dung câu hỏi

(Scenarios may contain multiple errors, which may or may not impact the solution.)Refer to the exhibit. An engineer has attempted to configure two pairs of switches in the referenced configuration. It is required to implement VSX keep-alive at the aggregation layer. The ports of the ArubaOS-CX 8325 switches used for Agg01 and Agg02 are populated as follows: VSX keep-alive is not working. Which modification should you make to resolve the error condition?

Minh họa câu hỏi Minh họa câu hỏi Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Modify the system interface-group 4 speed 10g command, change “10g” to “25g”
  2. B. Edit the vsx-sync command, adding “keep-alive”
  3. C. Edit interface 1/1/48, changing “vrf attach KA” to “vrf attach ka”
  4. D. Modify the interface lag 2 command, removing “multi-chassis” — đáp án hiện tại