Question 13: HPE7-A05: HPE Network Data Center Professional
A new CX 8325 Switch Series has been mounted and powered up. The management interfaces have been plugged into the OOB management network. One hour later, you notice that there are no new leases in the DHCP server pool for the OOB Management network, and the Global Status LED is still flashing on the switch. What would…
Nội dung câu hỏi
A new CX 8325 Switch Series has been mounted and powered up. The management interfaces have been plugged into the OOB management network. One hour later, you notice that there are no new leases in the DHCP server pool for the OOB Management network, and the Global Status LED is still flashing on the switch. What would cause this behavior?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. An initialization failure has occurred on the switch with one of the switch ports. — đáp án hiện tại
- B. The switch is powered up normally, but the DHCP relay is not configured on the network.
- C. The switch is powered up normally, but the DHCP server pool is not active.
- D. The switch unit has the fan trays installed but is not receiving power.
Answer researched independently against supporting documentation; not a published source answer key. Derived answer: sustained flashing Global Status indicates an initialization/hardware fault, matching A. References: https://www.arubanetworks.com/techdocs/hardware/switches/8325/IGSG/Aruba_8325_IGSG_en_us.pdf