Câu 35: HPE7-A06: HPE Aruba Networking Certified Expert - Campus Access Switching
Two CX 8325 switches are configured as a cluster using VSX for the core role and two CX 6300M in VSF for the aggregation role. When a major software upgrade is issued on the switches, what is the method to achieve a hitless upgrade with the core switches?
Nội dung câu hỏi
Two CX 8325 switches are configured as a cluster using VSX for the core role and two CX 6300M in VSF for the aggregation role. When a major software upgrade is issued on the switches, what is the method to achieve a hitless upgrade with the core switches?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. ISSU update-software initiates the upgrade first on the primary switch, followed by the secondary
- B. ISSU update-software initiates the upgrade first on the secondary switch, followed by the primary
- C. VSX update-software initiates software upgrade first on the secondary switch, followed by the primary — đáp án hiện tại
- D. VSX update-software initiates software upgrade first on the primary switch, followed by the secondary
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.