Câu 97: H13-629: HCIE-Storage
In order to support business expansion, a large enterprise has decided to purchase two Huawei OceanStor 9000 storage systems instead of existing NAS systems. Cheng replication capabilities, The two systems were deployed in two cities. S data center (D and Y said), mutual backup, usually a system as the main System wor…
Nội dung câu hỏi
In order to support business expansion, a large enterprise has decided to purchase two Huawei OceanStor 9000 storage systems instead of existing NAS systems. Cheng replication capabilities, The two systems were deployed in two cities. S data center (D and Y said), mutual backup, usually a system as the main System work, the other as a disaster recovery system, The main operating system of the business operation time is 8: 00-18: 00. Which of the following description of disaster recovery on disaster recovery applications planning is correct? (Multiple choice.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Info replication As an optional feature of Huawei OceanStor 9000de, the production sites and disaster recovery sites need only the production site to purchase info replicator feature of the license
- B. Plan a separate directory for each type of service using the Huawei OceanStor 9000 system at the D and Y sites in the system's root directory As a remote copy of the master directory, and shared to the corresponding business server i — đáp án hiện tại
- C. Because the client's business traffic is mainly concentrated in the daytime working hours, you can not set the replication zone bandwidth limit, the synchronization task on the non-workers Make time, take full advantage of node bandwidth — đáp án hiện tại
- D. For each type of business to create a pair for the type of business data replication synchronization — đáp án hiện tại