CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 19: H20-688-V1-0: HCSP-Field-SQA V1.0

Which of the following is correct if the outer package of the equipment is found to be damaged during entry management?

Nội dung câu hỏi

Which of the following is correct if the outer package of the equipment is found to be damaged during entry management?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. The onsite SQA and the supervision engineer can receive the equipment after check.
  2. B. Remind the supervision engineer and project team to communicate with the supplier and fill in the Cargo Replacement Application Form.
  3. C. The supervision engineer evaluates whether the equipment meets the installation requirements and whether the equipment needs to be returned to the factory for repair/replacement.
  4. D. Communicate with the EPC/customer and owner about whether to receive the equipment after further check. — đáp án hiện tại

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề