Câu 25: C1000-031: IBM Power Systems Scale-Up Technical Sales
A customer has ordered a Power System E980. The system has been built, but cannot be shipped. What would prevent the system from being shipped?
Nội dung câu hỏi
A customer has ordered a Power System E980. The system has been built, but cannot be shipped. What would prevent the system from being shipped?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. The mandatory pre-install TDA has not been completed.
- B. The IBM System Support representative has not completed the pre-install site visit.
- C. The opportunity owner has not released it.
- D. A pre-sale TDA discovered correctable issues that have not been corrected. — đáp án hiện tại
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.