CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 13: C1000-031: IBM Power Systems Scale-Up Technical Sales

A customer with a Power System E880C is considering a model conversion to a Power System E980. They currently have Elastic CoD enabled. Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?

Nội dung câu hỏi

A customer with a Power System E880C is considering a model conversion to a Power System E980. They currently have Elastic CoD enabled. Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Prepay for Elastic CoD usage when placing the upgrade MES order for the Power System E980. — đáp án hiện tại
  2. B. Reorder the Elastic CoD enablement features when placing the upgrade MES order for the Power System E980.
  3. C. Reorder the Utility CoD enablement features when placing the upgrade MES order for the Power System E980.
  4. D. Convert static activations to mobile activations when placing the upgrade MES order for the Power System E980.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề