CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 5: C9530-001: IBM Integration Bus v10.0 Solution Development

A developer plans to create two new message flows. Flow1 that uses TimeoutControl and TimeoutNotification nodes in Controlled mode, and Flow2 that uses only the TimeoutNotification node in Automatic mode. The Integration Node is installed on a system without IBM MQ installed. What problems will the developer encounter?

Nội dung câu hỏi

A developer plans to create two new message flows. Flow1 that uses TimeoutControl and TimeoutNotification nodes in Controlled mode, and Flow2 that uses only the TimeoutNotification node in Automatic mode. The Integration Node is installed on a system without IBM MQ installed. What problems will the developer encounter?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Flow1 will not deploy successfully. Flow2 will not deploy successfully.
  2. B. Flow1 will not deploy successfully. Flow2 will deploy and execute successfully. — đáp án hiện tại
  3. C. Flow1 will not deploy successfully. Flow2 will deploy successfully but will produce an error when execution is attempted.
  4. D. Flow1 will deploy successfully but produce an error when execution is attempted. Flow2 will deploy and execute successfully.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề