A risk practitioner observes that hardware failure incidents have been increasing over the last few months. However, due to built-in redundancy and fault-tolerant architecture, there have been no interruptions to business operations. The risk practitioner should conclude that:

Nội dung câu hỏi

A risk practitioner observes that hardware failure incidents have been increasing over the last few months. However, due to built-in redundancy and fault-tolerant architecture, there have been no interruptions to business operations. The risk practitioner should conclude that:

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. no action is required as there was no impact
  2. B. a root cause analysis is required
  3. C. hardware needs to be upgraded
  4. D. controls are effective for ensuring continuity — đáp án hiện tại