You are following a risk-based testing strategy. The test execution time is very limited. Assume that all the product risk items require more or less the same level of test effort. Which of the following answers describes the best execution schedule in this scenario?
Nội dung câu hỏi
You are following a risk-based testing strategy. The test execution time is very limited. Assume that all the product risk items require more or less the same level of test effort. Which of the following answers describes the best execution schedule in this scenario?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. 1- Test the acceptance of transactions coming from the IVR channel2- Test the correct charge of the Smart Card with the required contents3- Test the correct pre-activation of the Smart Card4- Test the correct activation of the Smart Card
- B. 1- Test the correct pre-activation of the Smart Card2- Test the correct charge of the Smart Card with the required contents3- Test the correct activation of the Smart Card4- Test the acceptance of transactions coming from the IVR channel
- C. 1- Test the correct activation of the Smart Card2- Test the correct pre-activation of the Smart Card3- Test the correct charge of the Smart Card with the required contents4- Test the acceptance of transactions coming from the IVR channel
- D. 1- Test the correct pre-activation of the Smart Card2- Test the correct activation of the Smart Card3- Test the correct charge of the Smart Card with the required contents4- Test the acceptance of transactions coming from the IVR channel — đáp án hiện tại