CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 1: CTFL: 001_ISTQB Certified Tester Foundation Level (CTFL_001)

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? a. R…

Nội dung câu hỏi

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? a. Regression tests run and passed in systems testing b. Incidents closed in systems testing c. Planned tests run and passed in system testing d. Planned tests run and passed at all levels of testing e. Incidents raised and closed at all levels of testing

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. a and e — đáp án hiện tại
  2. B. b and c
  3. C. d and e
  4. D. a and b A

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề