Câu 14: CTAL-TAE: Certified Tester Advanced Level Test Automation Engineering

You work for a company that produces a credit checking software package. This product comes in three variants, each of which is tailored to the meet the rules and attitudes of lending and borrowing money for a particular group of countries. Each variant has two different versions at any one time: the current live rele…

Nội dung câu hỏi

You work for a company that produces a credit checking software package. This product comes in three variants, each of which is tailored to the meet the rules and attitudes of lending and borrowing money for a particular group of countries. Each variant has two different versions at any one time: the current live release, and the next release which is under development. Each variant has its own test environment; these environments are built on different platforms to reflect the diversity of real customer platforms. A single TAS meets the automation needs of all three variants, with configurable features that allow for the platform differences. The SUT’s test requirements are expanding rapidly and the TAS often needs enhancement to support this. The SUT’s platforms are also changeable, due to updates from their vendors or a desire to sample different ones. After any change, the TAS is re-installed from a central repository with automated scripts that implement the configuration parameters for the target environment. Following this, it has often been impossible to run tests properly or even at all and the installation has had to be repeated after the cause has been found. Which of the following actions are MOST likely to solve this issue?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Install by copying a standard configuration of the TAS from the central repository.
  2. B. Stricter documentation and configuration management of the TAS components. — đáp án hiện tại
  3. C. Connectivity checks after installation to verify interoperability between the TAS and the SUT platforms.
  4. D. Non-functional testing of TAS components before installation to verify their interoperability with their target platforms.