Câu 10: JN0-661: Service Provider Routing and Switching

During a network migration window, an engineer issues the set protocols isis overload timeout 1200 command. In this scenario, which effect does this have on the IS-IS operations of the router?

Nội dung câu hỏi

During a network migration window, an engineer issues the set protocols isis overload timeout 1200 command. In this scenario, which effect does this have on the IS-IS operations of the router?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. After the first IS-IS adjacency forms, the overload bit is set for 1200 seconds.
  2. B. When the IS-IS protocol starts, the overload bit is set after the timer of 1200 seconds expires.
  3. C. When the IS-IS protocol starts, the overload bit is set for 1200 seconds. — đáp án hiện tại
  4. D. After the first IS-IS adjacency forms, the overload bit is set after the timer of 1200 seconds expires.