Câu 27: 70-345: Designing and Deploying Microsoft Exchange Server 2016

Your company has two offices. Each office contains a data center. Each data center is configured as a separate Active Directory site. The data centers contain five servers that have Exchange Server 2016 installed. The servers are configured as shown in the following table. All of the servers are members of a database…

Nội dung câu hỏi

Your company has two offices. Each office contains a data center. Each data center is configured as a separate Active Directory site. The data centers contain five servers that have Exchange Server 2016 installed. The servers are configured as shown in the following table. All of the servers are members of a database availability group (DAG) named DAG1. Each server contains several mailbox database copies. You plan to shut down EX1 to replace several hardware components. You expect that EX1 will be restarted in one week. You need to manually exclude EX1 from cluster voting during the planned maintenance period. What should you run?

Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Set-MailboxServer EX1 ""DatabaseCopyAutoActivationPolicy Blocked
  2. B. Stop-DatabaseAvailabilityGroup DAG1 ""Mailbox Server EX1 Restore-DatabaseAvailabilityGroup ""ActiveDirectorySite Site1 — đáp án hiện tại
  3. C. Stop-DatabaseAvailabilityGroup DAG1 ""ActiveDirectorySite Site1 Restore-DatabaseAvailabilityGroup ""ActiveDirectorySite Site2
  4. D. Remove-DatabaseAvailabilityGroupServer EX1