CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 2: 70-496: Administering Visual Studio Team Foundation Server 2012

Your network environment includes a Team Foundation Server (TFS) 2012 named TFS1 that contains two project collections named PC1 and PC2. A build server named Bi is configured with a build controller named C1 and an agent named A1 that runs build definitions created in Pd. A development team wants to create a gated ch…

Nội dung câu hỏi

Your network environment includes a Team Foundation Server (TFS) 2012 named TFS1 that contains two project collections named PC1 and PC2. A build server named Bi is configured with a build controller named C1 and an agent named A1 that runs build definitions created in Pd. A development team wants to create a gated check-in build definition on PC2. You need to perform a supported infrastructure enhancement to run PC2 build definitions. What should you do?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. • Add a new build server (B2). • On the B2 build server, migrate controller C1 and install a new controller (C2) that connects to the PC2 project collection. • On the Bi build server, configure a second build agent (A2) that uses the C2 controller.
  2. B. • Add a new build server (B2). • On the B2 build server, install a build controller (C2) that connects to the PC2 project collection. • On the B2 build server, configure a second build agent (A2) that uses the C2 controller. — đáp án hiện tại
  3. C. • On the Bi build server, configure the C1 controller to connect to project collections PC1 and PC2. • On the Bi build server, update the Al agent to use controllers C1 and C2.
  4. D. • On the Bi build server, configure the C1 controller to connect to project collections PC1 and PC2.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề