Câu 59: AZ-100: Microsoft Azure Infrastructure and Deployment
DRAG DROP -You have an availability set named AS1 that contains three virtual machines named VM1, VM2, and VM3. You attempt to reconfigure VM1 to use a larger size. The operation fails and you receive an allocation failure message. You need to ensure that the resize operation succeeds. Which three actions should you p…
Nội dung câu hỏi
DRAG DROP -You have an availability set named AS1 that contains three virtual machines named VM1, VM2, and VM3. You attempt to reconfigure VM1 to use a larger size. The operation fails and you receive an allocation failure message. You need to ensure that the resize operation succeeds. Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. Select and Place:
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
-
A. Lựa chọn A bằng hình ảnh — đáp án hiện tại
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.