Câu 72: MB-335: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert

You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:• The setup uses a Lean schedule group with a throughput ratio = 2.• The process activity tied to production flow has the following runtime activity times: time = 3 min, per qua…

Nội dung câu hỏi

You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:• The setup uses a Lean schedule group with a throughput ratio = 2.• The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.• The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).• The throughput is 10 per hour. You need to set up a Discrete operation to mirror the item’s production flow activity. What should you do?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.
  2. B. Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.
  3. C. Create a route with a runtime = 10, a process quantity = 6, and the operation's hours/time = 1.
  4. D. Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/ 60 minutes). — đáp án hiện tại