You need to prepare to deploy a software deployable package to a test environment. What are two possible ways to achieve the goal?Each correct answer presents a complete solution.NOTE: Each correct selection is worth one point.
Nội dung câu hỏi
You need to prepare to deploy a software deployable package to a test environment. What are two possible ways to achieve the goal?Each correct answer presents a complete solution.NOTE: Each correct selection is worth one point.
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. In Visual Studio, export the project and upload the project to the asset library.
- B. In Azure DevOps, queue a build from the corresponding branch and upload the model to the asset library.
- C. In Azure DevOps, queue a build from the corresponding branch and upload the package to the asset library. — đáp án hiện tại
- D. In Visual Studio, create a Dynamics 365 deployment package and upload the package to the asset library. — đáp án hiện tại