Câu 84: PL-400: Microsoft Power Platform Developer
A customer wants to design a complex business process flow that includes six custom entities and four stages for each entity. One of the stages will have 15 steps. You need to explain the flaw in this design to the customer. What is the flaw in this design?
Nội dung câu hỏi
A customer wants to design a complex business process flow that includes six custom entities and four stages for each entity. One of the stages will have 15 steps. You need to explain the flaw in this design to the customer. What is the flaw in this design?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. The maximum number of custom entities has been exceeded. — đáp án hiện tại
- B. The maximum number of steps for a stage has been exceeded.
- C. The maximum number of stages for an entity has been exceeded.
- D. The minimum number of stages for an entity has not been met.
- E. The minimum number of steps for a stage has not been met.