CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 8: NS0-182: NetApp Certified Storage Installation Engineer, ONTAP

You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site. Referring to the exhibit, which steps are required to get an HA cabled system?

Nội dung câu hỏi

You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site. Referring to the exhibit, which steps are required to get an HA cabled system?

Minh họa câu hỏi

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 4. 2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 4. 3. Cable the out-of-band ACP.
  2. B. 1. Insert a cable from right controller port 0a to IOMA port 1, and from port 0b to IOMB port 3. 2. Insert a cable from left controller port 0a to IOMB port 1, and from port 0b to IOMA port 3.
  3. C. 1. Insert a cable from right controller port 0a to IOMB port 1, and from port 0b to IOMA port 4. 2. Insert a cable from left controller port 0a to IOMA port 1, and from port 0b to IOMB port 4. 3. Cable the out-of-band ACP. — đáp án hiện tại
  4. D. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 3. 2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 3.

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề