Câu 8: NS0-182: NetApp Certified Storage Installation Engineer, ONTAP
You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site. Referring to the exhibit, which steps are required to get an HA cabled system?
Nội dung câu hỏi
You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site. Referring to the exhibit, which steps are required to get an HA cabled system?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 4. 2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 4. 3. Cable the out-of-band ACP.
- B. 1. Insert a cable from right controller port 0a to IOMA port 1, and from port 0b to IOMB port 3. 2. Insert a cable from left controller port 0a to IOMB port 1, and from port 0b to IOMA port 3.
- C. 1. Insert a cable from right controller port 0a to IOMB port 1, and from port 0b to IOMA port 4. 2. Insert a cable from left controller port 0a to IOMA port 1, and from port 0b to IOMB port 4. 3. Cable the out-of-band ACP. — đáp án hiện tại
- D. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 3. 2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 3.