Câu 26: NS0-184: NetApp Certified Storage Installation Engineer, ONTAP
You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF. In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)
Nội dung câu hỏi
You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF. In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Load the Storage RCF.
- B. Cable the AFF A250 nodes to the next free ports on the switch.
- C. Cable the AFF A250 nodes to the breakout ports on the switch. — đáp án hiện tại
- D. Load the Cluster-HA-Breakout RCF. — đáp án hiện tại
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.