CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 8: NS0-520: NetApp Certified Implementation Engineer - SAN ONTAP

You are testing FPC path failures on a 2-node NetApp AFF All SAN Array and verify that persistent ports are correctly enabled. Before testing, a host sees four optimized paths to a LUN. You perform a node takeover and re-check the host. Which statement is true after the node takeover?

Nội dung câu hỏi

You are testing FPC path failures on a 2-node NetApp AFF All SAN Array and verify that persistent ports are correctly enabled. Before testing, a host sees four optimized paths to a LUN. You perform a node takeover and re-check the host. Which statement is true after the node takeover?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. The host sees two optimized paths and two non-optimized paths to the LUN.
  2. B. The host sees two optimized paths and two dead paths to the LUN.
  3. C. The host sees two non-optimized paths and two dead paths to the LUN.
  4. D. The host sees four optimized paths to the LUN. — đáp án hiện tại

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề